Group hoist electric hoist trial hoist

2025-07-14

rizhi

Before the formal hoisting, a trial hoist must be conducted. Slowly lift the heavy object off the ground (or support) by 100-200mm. Conduct a comprehensive inspection: pause and check the reliability of braking for all cranes, structural stability (foundation, bracket, track), safety of lifting equipment (steel wire rope, hook, shackle), balance of the lifted object, synchronization, load distribution, etc. Confirm correctness: after confirmation by the overall commander that everything is normal, continue with the hoisting.